Friday, August 10, 2018

What's in a floor?

A lot!  First Chris had to shovel several dump truck loads of gravel into the foundation.....by hand!  Then run all the electrical wires and plumbing pipes that would be buried in the concrete.  Then shovel more gravel to cover the pipes.  Then level and pack it down.  Then the vapor barrier and insulation board.  Then the radiant floor pipes.  Along with many other steps I'm sure I'm missing!  All this very important prep work gets covered up and never seen again!


Angling the pipes so they have just the right degree of slope

Each pipe needs to drain towards the septic

Cold and hot water lines, waste pipes, and conduit for the electrical wires

Then after the many days and thousands of pounds of shoveled gravel it gets covered up with vapor barrier and foam insulation boards

Laundry room, bathroom, and master bedroom

The radiant floor pipes need to be spaced out just right

Next, metal grid is placed on top of the pipes to provide more stability for the concrete

The many thousands of Tent and Forest caterpillars had to be removed from the insulation board before the concrete could be poured.  We didn't want all the corpses floating in our floor

Finally ready!


The crew arrived early in the morning

They didn't waste a moment

This neat machine vibrates to get all the bubbles out of the concrete and level it

One wheelbarrow full at a time....

Hey!  Its starting to look like a floor!

Poured, smoothed, and finished!  We're so pleased!




1 comment:

Unknown said...

A ton of hard work. But so worth it. The floor looks great. Can't went to see the finished product.