| Two wonderful women working in sync |
| Finnlee ready to help! |
| Zander is ripping some lumber |
| Friends have chipped in from time to time. Thanks for your help Austin. Glad to see safety first, the eyes in the top of your head are well protected! |
| Two wonderful women working in sync |
| Finnlee ready to help! |
| Zander is ripping some lumber |
| Friends have chipped in from time to time. Thanks for your help Austin. Glad to see safety first, the eyes in the top of your head are well protected! |
| Stitching, a two person job. Jan and Heather work well together |
| In this case the size of the needle really does matter |
| Here we see a gap in the straw that needs filling. Gaps like these became known as black holes. So much straw disappears into them |
| The handmade straw stuffer in action |
| Our friend Nicole stuffing straw in the foreground and Chris prepping flashing in the background |
| So, this has been our home for the past few months |
| A huge improvement in living conditions |
| Looking out the front porch, we can see the roof of our new house to give you an idea of how far it is from my parents' place |
| These kids, on the other hand, love having more personal space |
| Chris has been working on attaching the plumbing pipes throughout the house |
| Our original plan did not include a sump pump. The excessive rains this year have shown us that was a mistake! Good thing Chris noticed before the concrete pad was poured! |
| This is the ceiling of the master bedroom, also the underside of the floor of the girls' room and upstairs bathroom |
| Some of our awesome friends loaned us their backhoe! |
| Chris used it to dig the trenches for drainage, well, electrical, and septic |
| Thankfully, he didn't find any rocks he couldn't handle |
| I think Chris enjoyed driving the Kubota |
| Making our way around was tricky for several days |
| Of course Zander needed to give it a whirl |
| And so did Phoenix |
| And Finnlee. Notice the concentration on all their faces |
| Drainage trench. See the puddle? |
| After laying the wire and pipes, Chris is now working on filling these trenches back in |
| Zander helped build and raise the wall to his own bedroom |
| Phoenix and Zander helping Chris put up the wall for the girls' dressing room |
| And windows framed in on all the outer walls |
| We have a temporary set of stairs going to the upper level. Now we don't have to climb in the window at the back to get onto the top floor! |
| Zander and Chris finishing the windows and cladding on the East wall |
| I love that the kids have been able to actually help building their own house. It gives them a greater sense of ownership and pride |
| Austin and Chris cladding the South wall with plastic to let in light and passive solar heat |
| Snug as its going to get for winter this year! It actually warms up quite nicely when the sun is shining! |
| Now Chris is working on the electrical. He will then move on to plumbing. Both run through the floor to some extent and must be completed before we pour the concrete slab in the spring |
| We've had a lot of help along the way. |
| Steve, Michael, and Eric came over to begin laying the metal sheets |
| First sheet on the South slope |
| After the first few sheets were up, Chris was able to do some on his own. This was before he became ill |
| He rolled the sheets up, hauled them up and over the peak |
| Then unrolled and secured them |
| The house from the edge of our property |
| Youssef, Chris, and Jessie working on the South slope |
| The view from my parent's property |
| Eric, Kevin, and Chris secure the last Southern sheet! |
| And finally, Austin and Chris secure the ridge cap, and its done! I guess it wasn't unending, but it sure felt that way! |