A bale re-strung and tied, then notched with a chainsaw ready for the wall |
Zander and Chris fitting the last few bales into the top of the South wall |
Here you can see how the bales fit around the studs. When the walls are done, the studs will all be inside the bales and not visible from the inside or outside |
Chris on his makeshift scaffold. A board hanging from the roof because the regular scaffolding can't sit on the ground on the East wall with all the rocks! |
My 2 men working on the top of the South East corner |